2021
Weis 191-Gap
9/20- 4/21
This 45,000 sq ft store was a total loss from a fire earlier in the year, so this project was a total new fit out in the existing space.
New 3,000 amp service
All new power distribution system
All new lighting and danfoss controls
Walk in freezer and cooler power
RTU power
Power for refrigerated cases and controls
Power for Deli and Bakery departments including equipment
Dock power and equipment
Register and POS power and equipment
Lancaster Catholic High School
Phase 1B
5/21-8/21
This was a full gut and fit out of Reilly Hall. This second floor project was original from the late 60's. This floor was totally gutted down to the exterior walls and building steel. New masonry corridor walls were built and traditional framed demising walls. New classrooms were built and utilized as new Lab classrooms.
All new lighting
Several panelboards throughout
Lots of general power for student use in the labs
Control wiring and terminations for door/card access as well as water and gas shut off's in the labs.
Ran a new 800 amp 480v feed from the existing exterior gear through the school's existing first floor hallways and into a mechanical room for a 800 amp MDP and 225 KVA transformer and an 800 amp 208v MDP. This supplied power for the fit out on the 2nd floor along with power demands for future phases.
Giant 6485- Mt joy
3/21-10/21
This was a full store remodel along with a 50' full building addition on to the east side of the building.
The remodel aspect involved:
A new décor package
New lighting in the produce area
New refrigerated cases throughout
We relocated the produce cases and all of the aisles in the store moved several feet for the new addition. In addition we installed power for a new walk-in freezer, new dairy wall with relocated dairy cases and a new click and collect area. This job also involved relocating the customer service area. The existing customer service had 3 panelboards in it, so we had to relocate the panels and all of the existing circuits that fed the store during off hours and make sure everything was back online in the morning.
Giant 6447- Linglestown
6/21-12/21
This was a full store remodel. We added:
A new sushi area
Beer tap wall
Saladworks
Floral department.
New décor package
New 400 amp panel and transformer in an electrical closet for electrical needs for this remodel.
We added several power circuits for new berry cases and miscellaneous department needs throughout the store.
We installed new lighting in produce and in the back aisleway.
All of the refrigerated cases on this project were replaced with new ones.
This was a very invasive remodel!
After the remodel was complete we also installed a new Starbucks kiosk. This required us to run a new 200 amp feed from the electrical room and do all of the final connections for their equipment.
Giant 6529- Enola
7/21-10/21
This was a partial store remodel. This involved:
A new decor package
New floral department
New lighting in the produce area
Several relocated cases to shift the Deli department and add in a sushi case.
After this remodel we also installed a new Starbucks kiosk at this location.
Weis 148-Lebanon
9/21-12/21
This was a partial store remodel. This store required:
A new decor package
New floral department
New lighting in Produce and the Deli prep area
New Seafood department
A relocated/new customer service.
The customer service relocation also included the relocation of 3 existing panelboards. These panels had to be re-fed from overhead as the underground feeds could not be relocated. We provided new panels and feeds for this and relocated the existing circuits.